Concrete
Concrete Repair & Replacement
Concrete does not fail quietly. A crack becomes a lip, a lip becomes a broken corner, and by the third winter the slab is in pieces. Some of that is fixable. Some of it is a sign the base underneath has gone, and patching it is money spent on a slab that is already finished. We tell you which is which, on site, and we do both: repairs where they will hold, removal and a new pour where they will not.
In pictures
Concrete · Concrete Repair & Replacement
What this work looks like
We repair and replace concrete across Philadelphia, South Jersey and northern Delaware: patios, walks, steps, driveways and small slabs. Removal includes breaking, hauling and leaving the site clean.
Stock photography for illustration. Our own project photos are on the way.
Spec sheet
Concrete · Concrete Repair & Replacement
Time, permit, material, lifespan
The questions we get on every call, answered before the call.
| On site | 1 day for repairs, 1 to 3 days for removal and replacement |
|---|---|
| Walk on it | Repairs: same day. New pour: 24 to 48 hours. |
| Permit | Only for public sidewalk or curb work |
| Materials | Polymer repair mortar for patches, air-entrained concrete for new pours |
| Lifespan | A good repair: years. A new pour: decades. |
| Best for | Anything with a lip, a hole, or a crack you could fit a coin in |
What is included
- On-site assessment and a clear fix-or-replace recommendation
- Cracks routed, cleaned and filled with flexible sealant
- Spalled surfaces ground and resurfaced with bonded overlay
- Broken sections removed and hauled away
- New base compacted and new concrete poured to match the old joint layout
- Steps reformed with even risers, railings reset
Signs
Concrete · Concrete Repair & Replacement
How you know this is the chapter you need
- 01
One straight crack
Often just shrinkage. Sealed properly it stays a line and never becomes a lip.
- 02
Cracks in a web
The base has moved or the slab was too thin. This one is a replacement, and we will show you why.
- 03
A sunken section
Water has washed out the base. Sometimes it can be lifted; often the honest fix is to pour that section new.
- 04
Flaking, pitted surface
Salt and freeze-thaw eat the top layer. If the slab is sound underneath, it can be resurfaced.
Not sure what it needs?
Text a photo. We tell you what it needs.
How it goes
Concrete · Concrete Repair & Replacement
From the first visit to the walkthrough
- 01
We look before we quote
A photo helps, but we come out to see how the slab moves and what the base is doing.
- 02
Fix or replace, in writing
If a repair will hold, we quote the repair. If it will not, we say so and quote the replacement instead.
- 03
The work
Repairs are usually a day. Replacements follow the same steps as a new pour.
- 04
Done and checked
We walk it with you. If something we built is not right, we come back and fix it.
Questions
Concrete · Concrete Repair & Replacement
Concrete Repair & Replacement, answered
-
Can a cracked slab be repaired or does it need replacing?
A single crack with no height difference can be sealed and will hold. A web of cracks, a sunken section or a lip means the base has failed and the slab should be replaced. We tell you which on site.
-
How long does concrete repair take?
Most crack and surface repairs are done in a day and can be walked on the same day. Removal and a new pour is one to three days plus a day or two of cure.
-
Will a repair match the old concrete?
Close, not perfect. New concrete is lighter for the first year and then weathers in. If matching matters, replacing the whole section gets you an even finish.
-
Do you remove concrete only?
Yes. If you want an old slab or patio gone and the space returned to lawn or bed, we break it out, haul it and grade the soil.
Order form
Free on-site estimate · No obligation
Tell us what you are picturing. We come and measure it.
Nothing is priced from a website. We come to the house, walk the yard with you, and you get a written scope with the material, the size and the dates. Most simple decks are a few days of work; most concrete is two to four.
- Measured on site, written down before anything starts
- If something we built is not right, we come back and fix it.
- The people who quote the job are the people who build it
Rather talk now?