Concrete

Concrete Repair & Replacement

Concrete does not fail quietly. A crack becomes a lip, a lip becomes a broken corner, and by the third winter the slab is in pieces. Some of that is fixable. Some of it is a sign the base underneath has gone, and patching it is money spent on a slab that is already finished. We tell you which is which, on site, and we do both: repairs where they will hold, removal and a new pour where they will not.

In pictures

Concrete · Concrete Repair & Replacement

What this work looks like

We repair and replace concrete across Philadelphia, South Jersey and northern Delaware: patios, walks, steps, driveways and small slabs. Removal includes breaking, hauling and leaving the site clean.

Spec sheet

Concrete · Concrete Repair & Replacement

Time, permit, material, lifespan

The questions we get on every call, answered before the call.

On site1 day for repairs, 1 to 3 days for removal and replacement
Walk on itRepairs: same day. New pour: 24 to 48 hours.
PermitOnly for public sidewalk or curb work
MaterialsPolymer repair mortar for patches, air-entrained concrete for new pours
LifespanA good repair: years. A new pour: decades.
Best forAnything with a lip, a hole, or a crack you could fit a coin in

What is included

  • On-site assessment and a clear fix-or-replace recommendation
  • Cracks routed, cleaned and filled with flexible sealant
  • Spalled surfaces ground and resurfaced with bonded overlay
  • Broken sections removed and hauled away
  • New base compacted and new concrete poured to match the old joint layout
  • Steps reformed with even risers, railings reset

Signs

Concrete · Concrete Repair & Replacement

How you know this is the chapter you need

  1. 01

    One straight crack

    Often just shrinkage. Sealed properly it stays a line and never becomes a lip.

  2. 02

    Cracks in a web

    The base has moved or the slab was too thin. This one is a replacement, and we will show you why.

  3. 03

    A sunken section

    Water has washed out the base. Sometimes it can be lifted; often the honest fix is to pour that section new.

  4. 04

    Flaking, pitted surface

    Salt and freeze-thaw eat the top layer. If the slab is sound underneath, it can be resurfaced.

Not sure what it needs?

Text a photo. We tell you what it needs.

How it goes

Concrete · Concrete Repair & Replacement

From the first visit to the walkthrough

Hands measuring with a tape before the repair
  1. 01

    We look before we quote

    A photo helps, but we come out to see how the slab moves and what the base is doing.

  2. 02

    Fix or replace, in writing

    If a repair will hold, we quote the repair. If it will not, we say so and quote the replacement instead.

  3. 03

    The work

    Repairs are usually a day. Replacements follow the same steps as a new pour.

  4. 04

    Done and checked

    We walk it with you. If something we built is not right, we come back and fix it.

Questions

Concrete · Concrete Repair & Replacement

Concrete Repair & Replacement, answered

  • Can a cracked slab be repaired or does it need replacing?

    A single crack with no height difference can be sealed and will hold. A web of cracks, a sunken section or a lip means the base has failed and the slab should be replaced. We tell you which on site.

  • How long does concrete repair take?

    Most crack and surface repairs are done in a day and can be walked on the same day. Removal and a new pour is one to three days plus a day or two of cure.

  • Will a repair match the old concrete?

    Close, not perfect. New concrete is lighter for the first year and then weathers in. If matching matters, replacing the whole section gets you an even finish.

  • Do you remove concrete only?

    Yes. If you want an old slab or patio gone and the space returned to lawn or bed, we break it out, haul it and grade the soil.

Order form

Free on-site estimate · No obligation

Tell us what you are picturing. We come and measure it.

Nothing is priced from a website. We come to the house, walk the yard with you, and you get a written scope with the material, the size and the dates. Most simple decks are a few days of work; most concrete is two to four.

  • Measured on site, written down before anything starts
  • If something we built is not right, we come back and fix it.
  • The people who quote the job are the people who build it

Rather talk now?

About the job
Your details

We reply by phone or text. Your details are never sold or shared.

Call now Text a photo